Why should the auditorium be considered now?

With the one campus referendum passing in November of 2020, further discussions have occurred to determine the feasibility of adding the auditorium.

The construction will begin in spring to add the elementary wing to the existing MS/HS building. By adding the auditorium at the same time, the district would save money and reduce disruptions. The equipment and construction crews would be on-site and interest rates are low to borrow the money. If we wait, the cost to bring the equipment and crews back would be incurred and interest rates may change. It’s estimated that in 5 years it would cost the district roughly $2,263,000.00 𝙢𝙤𝙧𝙚 than building it in 2021-22. This does not include the possible increase in interest in 5 years.

Looking beyond the cost savings, we would be investing in our performing arts studies. The auditorium would provide a safe and ADA compliant experience for the participants and audience. Our community will also benefit from having an auditorium to utilize for performances, speakers, events, and more.

https://www.facebook.com/VanguardPride/photos/a.1656969124620020/2786238875026367/

Thoughts on the Auditorium: Why Build Now?

Upcoming Events